翻訳と辞書
Words near each other
・ Criterion of dissimilarity
・ Criterion of embarrassment
・ Criterion of multiple attestation
・ Criterion Place
・ Criterion Planners
・ Criterion Properties plc v Stratford UK Properties LLC
・ Criterion Restaurant
・ Criterion Stakes
・ Criterion Summit
・ Criterion Theatre
・ Criterion Theatre (Bar Harbor, Maine)
・ Criterion Theatre (Coventry)
・ Criterion Theatre (disambiguation)
・ Criterion Theatre (Sydney)
・ Criterion validity
Criterion Wind Project
・ Criterion, Oregon
・ Criterion-Referenced Competency Tests
・ Criterion-referenced test
・ Criterium
・ Criterium DecisionPlus
・ Criterium-Tauscher Cronacher Engineers
・ Crites
・ Crites Hall
・ Crites, West Virginia
・ Criteuil-la-Magdeleine
・ Crithagra
・ Crithe
・ Crithe caledonica
・ Crithe gofasi


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Criterion Wind Project : ウィキペディア英語版
Criterion Wind Project
The Criterion Wind Project is a wind farm located on Backbone Mountain east of Oakland, Maryland, United States. The project has a rated capacity of 70 MW and uses 28 Liberty Wind Turbines manufactured by Clipper Windpower. Each of the wind turbines is about 415 feet tall. The Criterion Wind Project is owned by Criterion Power Partners, LLC, which is a subisiary of Exelon, and interconnected with the transmission system of the Potomac Edison Company (a subsidiary of FirstEnergy). Electricity and renewable energy credits from the project are sold to the Old Dominion Electric Cooperative under a 20-year supply contract.
==History==
The Criterion Wind Project was originally proposed in 2002 by Clipper Windpower as a 101 MW project consisting of 67 1.8 MW. On March 26, 2003, the Maryland Public Service Commission issued a certificate of public convenience and necessity authorizing the construction of the wind farm. Opponents of the project filed a series of lawsuits which delayed construction of the project.〔See and .〕 In 2007, legislation was enacted by the Maryland General Assembly to streamline the permitting of wind farms with a capacity up to 70 MW. To meet the new statutory requirements, the Criterion Wind Project was then reconfigured as a 70 MW project consisting of 28 2.5 MW wind turbines. Clipper Windpower then sold the project to Constellation Energy,〔 which completed the project in December 2010.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Criterion Wind Project」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.